Deliver the programme — with information you can actually trust.
BIMWorkplace helps contractors control how information flows to site, align teams around the schedule, and capture what happened on the ground — so you reduce delay, rework, and disputes caused by wrong files, unclear ownership, and weak evidence.
For construction managers and delivery teams under real site pressure.
Contractors win or lose on time, sequencing, interfaces, and proof. BIM only helps when everyone is working from the same authorised information, when the plan is visible, and when site reality can be tied back to what was agreed. BIMWorkplace supports a single project backbone for controlled information and build-phase workflows — so coordination doesn't stop when design hands over.
Fewer "which version?" moments. Stronger programme control.
The daily friction that erodes margin on site — and how a connected backbone for documents, programme and site capture helps you stay in control.
- ✕Uncontrolled information to siteUse a CDE-style approach to authoritative documents, versions and transmittals — so packages and subcontractors aren't building against unauthorised copies.
- ✕Programme disconnected from realityRun construction planning with tasks, dependencies, baselines and progress in the project — with import/export paths for teams still living in Microsoft Project.
- ✕Late interface issuesBenefit from structured design coordination outputs (topics, clashes, IDS) earlier — so site isn't discovering clashes that should have died in design.
- ✕Weak evidence of what was built or decidedImprove traceability: who received what, what was current, what changed — supporting claims, quality discussions and handover.
- ✕Site communication that doesn't scaleTurn 360° walkthroughs into structured, reviewable evidence linked to project storage — instead of relying on ad-hoc photos and chats.
Contractor-grade delivery: information, time, and site — in one place.
The combination delivery teams need to control execution — documents, programme and site evidence working as one.
Controlled information (CDE)
Keep authorised documentation and controlled exchange so procurement, site and subcontractors align to one source of truth.
Programme execution (Build)
Operate schedules with dependencies, baselines and batch updates — so progress isn't tracked only in disconnected spreadsheets.
Site reality (Site Walk 360)
Move from "we visited the site" to repeatable capture: frames, manifests and sessions that support review and communication around what the site actually looks like.
Coordination continuity
Where design teams used BIMWorkplace for coordination and checks, contractors inherit a cleaner handover — less ambiguity, fewer hidden rework costs.
Receive → plan → execute → prove.
A consistent path from handover to site evidence — with the project as the source of truth at every step.
Receive controlled information
Use the CDE to ensure teams work from authorised files and structured transmittals.
Plan and measure time
Run the programme in the project with baselines and progress — including exchange paths compatible with MS Project XML where applicable.
Execute with clarity
Keep interfaces visible; reduce rework caused by late discovery of conflicts and missing information.
Prove what happened
Strengthen evidence with site capture workflows and traceable project records — supporting claims and handover.
Viewing models helps — controlling delivery wins the job.
Contractors need operational control: permissions, current documents, programme truth and site evidence. BIMWorkplace is positioned for teams who need delivery systems — not another passive model window in the trailer.
Built for teams who can't afford programme slip.
information-related delay when CDE, programme and site evidence live on the same backbone
"Subcontractors stopped asking which drawing was current. Programme reviews finally match what we see on site."
See how the rest of the supply chain works on BIMWorkplace.
Governance, visibility & evidence
How owners turn BIM into operational control — clear requirements, accountable delivery.
Coordination & model quality
How design teams keep federated delivery under control — fewer surprises at handover.
Stories by project type
Explore how teams use BIMWorkplace across infrastructure, residential and complex builds.
FAQs for contractors and construction managers.
Ready to unlock the full value of your BIM data?
Join 200+ construction teams already using BIMWorkplace 2.0.