Skip to main content
Pricing
Sign InBook a Demo
MODULE · MANAGEMENT

Governance where the project lives.

Standards, documents and communication in one place — not scattered across inboxes, shared drives and personal notes.

Management dashboard with a "Project Standards" card (BEP / EIR / MIDP status), a "Recent Correspondence" list and an upcoming meeting tile.
PROBLEMS WE SOLVE

The everyday pain of project governance — gone.

Management replaces scattered inboxes, shared drives and word-of-mouth decisions with one project workspace for standards, mail and meetings.

THREE PILLARS

One module. Standards, mail and meetings.

Governance for BIM projects — the documents you must deliver, the communication around them, and the decisions that move the work forward.

Project Standards — ISO 19650 information requirements visualized around a central BIM model
PILLAR 01

Project Standards

From OIR to TIDP — agreed rules for what information is needed and how it is exchanged, authored with Document Studio templates and structured to ISO 19650.

  • ISO 19650 areas (OIR · AIR · PIR · EIR · BEP · MIDP · TIDP)
  • Document Studio templates
  • Structured sections, blocks & variables
  • Linked to project context

Some standards areas are wired to Document Studio today; backend coverage continues to roll out.

Correspondence — formal project mail thread with searchable history and team access list
PILLAR 02

Correspondence

Formal project mail that stays with the project — not in someone's inbox. One searchable thread history, visible to the team that has access.

  • Single project inbox for formal mail
  • Searchable thread history
  • References to CDE folders & topics
  • Team-wide visibility

Correspondence is in active development — ask us about the rollout timeline.

Meetings — agenda, minutes, decisions and action items with completion tracking
PILLAR 03

Meetings

Agenda, attendees, minutes and decisions in the project context — so actions stay traceable after the call ends.

  • Scheduling with agenda & attendees
  • Structured minutes with action items
  • Status tracking (scheduled / held / closed)
  • Optional integrations (e.g. Fireflies)
WHAT'S INSIDE

Six capabilities. One governance workspace.

Everything a project needs to define standards, exchange formal communication and run accountable meetings.

Document Studio Templates

Templates with sections, blocks and variables — author standardized project documents from a single source.

ISO 19650 Spec Areas

Dedicated areas for OIR, AIR, PIR, EIR, BEP (design/build), MIDP and TIDP — aligned with ISO 19650 naming.

Project Correspondence

One project inbox for formal mail — searchable, team-visible, with references back to CDE and topics.

Meeting Agenda & Attendees

Schedule meetings with structured agendas and attendee lists — start every call from the same page.

Minutes & Action Items

Capture decisions and action items in the project — with status tracking from scheduled to closed.

Project-Scoped Audit Trail

Standards, correspondence and meetings all live in the project — visible to the team that has access.

ISO 19650 ready · Document Studio · Project-scoped · Audit trail

Ready to unlock the full value of your BIM data?

Join 200+ construction teams already using BIMWorkplace 2.0.

Prefer to start on your own?Sign up & buy a plan →
No credit card required · Free onboarding · Cancel anytime